Riyadh · Design, build, finish
Your home in 90 days.
Optima Homes designs, builds and finishes your home under one contract, with one team and one delivery date. You choose the model. We build it.
- 90 Days to handover
- 2 Home models
- 100% Turnkey delivery
Scroll
The build
Ninety days,
accounted for.
Our industrialised construction system moves work off the site and into controlled production. No trade waits for the one before it to finish.
The handover date is contractual, not aspirational.
-
01
Days 1 – 7
Survey and design lock
Site survey, soil report, plot fit study, model selection and finish sign-off. Drawings are frozen on day seven and do not move again.
-
02
Days 8 – 30
Foundation and structure
Raft foundation poured, precast walls and slabs set in sequence. The shell is closed and weather-tight before the first month ends.
-
03
Days 31 – 70
Services and finishes
Electrical, plumbing, HVAC, joinery and tiling run in parallel across floors rather than one trade after another.
-
04
Days 71 – 90
Commissioning and handover
Testing, snagging, landscaping and municipal clearance. Keys on day ninety — the date is written into your contract.
The configurator
See it before
you sign it.
Walk your home in the browser, change the exterior stone, the joinery and the roof line, and watch the specification update as you go. The configurator is in development and launches with our first models.
Exterior colour
Wall finish
Glass tint
Decorative finish
A quick sample on an illustrative model. The full configurator adds layouts, elevations, interior finishes and landscaping, and launches with our first models.
Home models
Our models.
Coming soon.
Our home models are being finalised. Each will arrive as a complete set of engineered, permit-ready drawings that you can adjust — layout, elevation and finishes — to suit how your family actually lives.